If you are interested in participating in this bid opportunity using our products or solutions, please complete and submit the form below:
Basic Information |
|
|---|---|
| Bid Title | CAMERAS FOR SAIL BOSTON (BPD) |
| Bid Number | BOSTN-EV00016786 |
| Bid Announced by | Boston Police Department, Telecommunications Division |
| Project Location(s) | Approx. 65 sites across the City of Boston’s waterfront and event zones. |
| City | Boston |
| State/Province | MA |
| Country | USA |
| Bid Issue Date | Nov 10, 2025 |
| Questions Due Date | - |
| Submittal Due Date | Nov 26, 2025 12:00 PM |
| Pre-bid Event | Mandatory |
| Pre-bid Event Date | - |
| Pre-bid Event Type | Contractor must conduct site inspections prior to bid submission. |
| Link To Bid Source | https://www.boston.gov/departments/procurement |
| Scope of Work | Furnishing, installation, configuration, and integration of approximately 125 high-definition cameras across 65 sites in support of the Sail Boston Security Operations Plan. |
| Required System | CCTV |
| Bid Specified Vendor(s) | - |
| Bid Contact Person | Brian Heger |
| Phone | (617) 635-2201 |
| [email protected] | |
| Notes | 1. 53 units New Cameras, 125 Camera Licenses, 35 Mounts / Pendants, 130 Wireless Antennas + Backhauls, 12 Network Switches + Injectors, 10 NEMA Enclosures + Mast Mounts, 1 lot Miscellaneous Hardware 2. Camera Specifications: (P. 2 of SOW_for_Sail_Boston_REV2.pdf) Minimum 5mp resolution and 30 fps recording under normal and high-motion conditions. Support for H.264/H.265 compression and motion optimization. Proven reliability over wireless point-to-point/multipoint connections. SOE (Storage on Edge) capability providing a minimum of 5 days of onboard video retention. IP66 weatherproof rating or higher. Access via secure iOS/Android mobile client. Integration with Genetec Security Center (CIMS) and Intermapper 3. All cameras must integrate with Genetec CIMS VMS and Intermapper network tools. (P. 1 of SOW_for_Sail_Boston_REV2.pdf) 4. Questions Due Date: At least 72 hours before bid closing 5. Contract Duration: 45 days for installation + 15 days for final acceptance (≈ 60 days total from Purchase Order) 6. Contractor must conduct site inspections prior to bid submission. (P. 3 of SOW_for_Sail_Boston_REV2.pdf) |
