Bid Issue DateSep 2, 2026
Questions Due DateSep 17, 2026 02:00 PM
Submittal Due DateSep 23, 2026 02:00 PM
Pre-bid EventOptional
Pre-bid Event DateSep 10, 2026 10:00 AM
Pre-bid Event TypeThere will be an optional prebid meeting on September 10, 2026 at 10:00 a.m. at the Facilities Office located at
900 Kenyon Street, Medford, OR 97501. Site visits can be arranged with Jeff Couch after the pre-bid meeting;
[email protected] - Note, nothing discussed during site visits will be part of the contract unless the
questions are sent, in writing, to [email protected] and included in an addendum.
Link To Bid Sourcehttps://www.medford.k12.or.us/departments1/purchasing-and-distribution-center/itb-27-00-01-camera-installation
Scope of WorkThe purpose and intent of this Invitation to Bid is to establish a firm fixed price contract with one qualified contractor to install 154 Avigilon IP cameras at 20 locations.
Required SystemCCTV
Bid Contact PersonPam Thoren
Phone(541) 842-1118
E-mail[email protected]
NotesThe School District has 20 sites that need to have cameras installed, moved or replaced.
 Install owner provided IP cameras per drawing. Contractor will provide white Cat6 cable and cat6 RJ45
connectors.
 Conduit, cable raceway, backboxes will be supplied by contractor if needed. Contractor will need to run
one home run to each camera and terminate at cat6 patch panel in IDF located on plan.
 Contractor will leave a 5’ coil as close to camera location as possible.
 All cables will be tested per TIA standards.
 There will 154 new cameras to install at 20 sites.
 Contractor will coordinate with Jeff Couch on aiming cameras.
 The cameras will be installed to manufacturer installation instructions.
 Four locations will require plenum cat6: South Medford High School, Jackson Elementary, Roosevelt
Elementary, Oak Grove Elementary.
 Project is to be completed no later than June 30th, 2027.
 Work may be completed at any time of the day. Will need to coordinate with school staff if doing work
during school hours.
 Contractor is responsible for obtaining all required state and local permits.
 Contractors work must conform to all code requirements including but not limited to the NEC, Oregon
Specialty Electrical code and all building code requirements.
 Contactor is responsible for ALL materials necessary to complete the job that is not clearly indicated as
owner provided. Owner provided materials are as follows; Contractor is responsible for all damages done
to walls, ceilings and finishes during installation of materials.
 Contractor is responsible for clean-up and restoration of the site. All ceiling tiles must be put back in
place every night. All dust and debris created by the contractor must be removed every night.
 All cameras are IP based

If you are interested in participating in this bid opportunity using our products or solutions, please complete and submit the form below:

Single bid opportunity
Scroll to Top