FOR INSTALLERS & INTEGRATORS

Need Help with Your Next Project?

Contact us for free assistance with product selection, system design, or bid preparation.

Contact Our Team+1 289 800 9000

Multi-Site AI Video Surveillance System


Back to all bids

Basic Information

Bid Title Multi-Site AI Video Surveillance System
Bid Number 2026-37
Bid Announced by The City of Bowling Green
Project Location(s) Bowling Green, KY
City Bowling Green
State/Province KY
Country United States
Bid Issue Date Jan 15, 2026
Questions Due Date –
Submittal Due Date Feb 4, 2026 10:00 AM
Pre-bid Event None
Pre-bid Event Date –
Pre-bid Event Type No site visits will be permitted for this bid, and the physical address and location of the sites will not be provided for security reasons.
Link To Bid Source http://www.bgky.org/
Scope of Work Installation of a complete turnkey system, which must include all necessary components, such as parts, labor, and services. Proposals should detail the scope of work, covering the procurement and installation of required equipment, as well as any necessary licenses and permits to ensure compliance with local regulations.
Required System CCTV
Bid Specified Vendor(s) –
Bid Contact Person Meghan VanMeter, Procurement Manager
Phone (270) 393-3000
E-mail –
Notes 1. 4 fisheye camera

2. System Requirements:
• Cameras with IR illumination to provide high-quality video feeds both during the day and night
• Centralized Management system on-premises via IP Network protocols to a central server in one
of our existing Data Centers
• AI-Power Analytics to provide notifications via email or text message to specified users when a
vehicle or person is detected.
o Notifications should be capable of being scheduled during specified day and time
periods. The schedule should be able to be changed as needed with minimal effort by
either the End Users or the System Administrators at the City of Bowling Green.
• Scalability: The system should be scalable and allow for expansion
• Enhanced Data Security: Systems should employ end-to-end encryption to protect sensitive
video data during transmission and storage, ensuring compliance with current and future
regulations.
• System should be able to perform on a single POE++ capable network switch, provided by the
City of Bowling Green, at each remote site.
• General Camera Requirements:
o 1 interior fisheye camera to provide coverage of the interior of the City-operated
structure on site
o Exterior coverage as designed by the bidder to provide coverage of the exterior of each
site based on the site guidelines in subsequent sections.

3. AI Camera Requirements
• Cameras must include a 7-year advanced replacement warranty provided by the manufacturer.
• AI-Powered Analytics for People Detection must include the following;
o Age Range Detection
o Gender Detection
o Hat
o Glasses
o Hair Type and Color
o Top Type and Color
o Bottom Type and Color
o Bag Color
o Shoe Color
• AI-Powered Analytics for Vehicle
o Vehicle Type
o Vehicle Color
o Vehicle Direction
• Outdoor cameras must be able to support LPR (State and Number), Make, and Model on the
edge.

4. The City will acknowledge receipt of all proposals at a public opening thereupon or about 10:05 a.m. CT via an online Lifesize meeting. The Lifesize meeting link is https://call.lifesizecloud.com/22870418. The passcode is 1017#. No cost information will be announced. Proposals must be received by the designated date and time and none will be considered thereafter.

5. Any additional questions may be submitted to the City of Bowling Green Procurement Manager.

6. All proposals must be turned in to the Procurement Manager’s Office, City Hall Annex, 1017 College Street, Bowling Green, KY, no later than 10:00 a.m. CT on date of proposal opening. Proposals cannot be accepted at any other location.

Request Bid Support

If you are interested in participating in this bid opportunity using our products or solutions, please complete and submit the form below:

Single bid opportunity

SUPPORT THROUGHOUT YOUR PROJECT

Need Help with Your Next Project?

Contact us for free assistance with product selection, system design, or bid preparation.

Contact Our Team+1 289 800 9000
Multi-Site AI Video Surveillance System. Original CASE CS-I4KS L-2.8-12mm and CS-I4US L-2.8-12mm product photographs used as illustrative planning references.
CASE product planning references: CS-I4KS L-2.8-12mm and CS-I4US L-2.8-12mm. Confirm permitted brands, specifications and compatibility in the official bid documents; the photographs do not establish acceptance.

Multi-Site AI Video Surveillance System (2026-37) brings together the published requirements for this security procurement opportunity in Bowling Green, KY, United States. The notice identifies The City of Bowling Green as the issuing organization. The published scope describes the following work: Installation of a complete turnkey system, which must include all necessary components, such as parts, labor, and services. Proposals should detail the scope of work, covering the procurement and installation of required equipment, as well as any necessary licenses and permits to ensure compliance with local regulations. Follow related bid opportunities on Anabon when planning your next proposal.

For this video-security opportunity, build the response around the stated camera locations, equipment schedule and existing recording or software platform. Compare product selection, network design and any licensing requirements with the actual scope, so the proposal explains how each specified deliverable will be addressed. For supporting preparation, read Security Camera Project Design Help: What Anabon Checks Before You Quote.

Anabon Security supports professional installers, integrators and dealers with product selection, system design, bid preparation and troubleshooting after installation. Explore IP camera options in the Anabon shop and CS-I4KS L-2.8-12mm from CASE as planning references. These links do not establish compliance, compatibility or acceptance of an alternative for this bid. Confirm the current status, deadlines, quantities and permitted substitutions in the official documents before preparing a submission.

Scroll to Top